studio blog

Thursday, September 10, 2009

proto progress



As the elements for my prototype are circulation and aperture, I started to incorporate more aperture and deconstruct the walls of my concept. The slot in the ceiling aligns with the slot on the next floor, allowing some connection between the modules. But, even as I type this, the design's getting another overhaul. Aperture is going to be incorporated into the steps, and the floors are going to go under the knife as well. Our final is due on Monday. It's going to be a long (and hopefully very productive) night.

No comments:

Post a Comment